Hilton Garden Inn
| Project Cost: | $12,466,577 |
| Completion: | March 2003 |
| Size of Project: | 122,000 sf |
| Delivery Method: | CM at Risk |
Seven stories and 144 rooms comprise the impressive new Hilton Garden Inn on Pensacola Beach. The entire facility encompasses 122,000 square feet and covers 5.4 acres. This hotel includes 20,000 square feet of ballroom and convention space and 12,000 square feet of lobby space, both with an exceptionally high level of interior finishes. The first floor lobby space includes areas for registration and guest services, as well as a fully functional restaurant, bar and indoor pool.
Construction of the hotel consisted of a poured-in-place concrete frame on augerast piling with an exterior wall of heavy gauge metal studs and stucco. Total construction time was 11 months.
The outside of this hotel is as impressive as the inside. The Gulf side of the facility includes a custom shaped pool, wading pool, and pool bar. With a location on the Gulf of Mexico, quality of workmanship and durability of materials were crucial to delivering a successful project. Greenhut worked in concert with the design team to select and install the best products for this project while maintaining the owner’s budget.